{"id":46509,"date":"2026-11-07T10:12:00","date_gmt":"2026-11-07T10:12:00","guid":{"rendered":"https:\/\/mgglobal.eu\/?p=46509"},"modified":"2026-11-07T10:12:00","modified_gmt":"2026-11-07T10:12:00","slug":"moody-news-7-%d0%bd%d0%be%d0%b5%d0%bc%d0%b2%d1%80%d0%b8-2026-%d0%b3","status":"publish","type":"post","link":"https:\/\/mgglobal.eu\/en\/moody-news-7-%d0%bd%d0%be%d0%b5%d0%bc%d0%b2%d1%80%d0%b8-2026-%d0%b3\/","title":{"rendered":"MOODY NEWS \u2014 7 November 2026"},"content":{"rendered":"<h2>New developments<\/h2>\n<h3>Waste Management Act extends checks across the waste chain<\/h3>\n<p>Bulgaria \u00b7 waste, reporting and audits \u00b7 legislative amendment in force<\/p>\n<p>The amendment to the Waste Management Act, promulgated in State Gazette No 99 of 30 October, took effect on the same day. The Minister of Environment and Water may commission agreed-upon procedures across the entire extended producer responsibility chain, including cross-checks of quantities, payments and source documents. Those being checked must provide full and timely access to documentation, systems, sites and information. For producers, recovery organisations and operators, this strengthens the link between reported results and evidence from counterparties. Weighbridge, transport and accounting records should be reconciled, and discrepancies resolved before a check.<\/p>\n<h3>DAkkS accepts initial applications under ISO\/IEC 17020:2026<\/h3>\n<p>Germany \/ international supply chains \u00b7 inspection and accreditation \u00b7 accreditation transition phase started<\/p>\n<p>From 1 November, DAkkS generally accepts initial applications for accreditation of inspection bodies under ISO\/IEC 17020:2026; applications under the previous edition are no longer accepted. Transition applications can also be submitted from that date. Assessments against the revised standard are planned from January 2027. The German accreditation body announced this on 26 October; today\u2019s signal concerns the start of this phase, rather than a new publication of the standard. Inspection organisations accredited by, or applying to, DAkkS should check their systems, competence and evidence against the published transition guidance. Legally prescribed editions or limited validity require individual clarification with DAkkS.<\/p>\n<h3>New method for proving the winter contribution to PM10<\/h3>\n<p>EU \/ Bulgaria \u00b7 environment and laboratory measurements \u00b7 adopted implementing decision<\/p>\n<p>Commission Implementing Decision (EU) 2026\/2468, published on 6 November, specifies how Member States demonstrate the contribution of winter sanding and salting to PM10 exceedances. It requires an unambiguously identified source, sufficiently accurate quantification, representative monitoring sites and evidence of reasonable dust-reduction measures. Results are documented in technical reports; deduction is not automatic. The Decision enters into force on 26 November 2026. Competent authorities, municipalities and laboratories should check sampling, chemical analysis, meteorological data and the traceability of calculations. Distinguishing dust from winter road treatment from the contribution of other sources is particularly important.<\/p>\n<h3>REACH broadens the scope for exemptions in the interests of defence<\/h3>\n<p>EU \/ Bulgaria \u00b7 chemicals and defence supplies \u00b7 adopted legislative amendment<\/p>\n<p>Regulation (EU) 2026\/2382, published on 3 November, amends the possibility for Member States to exempt substances from REACH where necessary in the interests of defence. The new Article 2(3) covers substances on their own, in mixtures or in articles, and removes the restriction to specific cases. The change enters into force on 23 November 2026. It does not automatically exempt defence companies or their suppliers from the requirements. Organisations should check whether an applicable national decision exists, its exact scope and how the legal basis is documented. Chemicals compliance audits need a clear distinction between a granted exemption and ordinary obligations.<\/p>\n<h3>CLP also allows broader national defence exemptions<\/h3>\n<p>EU \/ Bulgaria \u00b7 chemicals, labelling and defence supplies \u00b7 adopted legislative amendment<\/p>\n<p>A separate amendment in Regulation (EU) 2026\/2382 concerns CLP, the rules for classification, labelling and packaging of chemicals. Member States may exempt substances, mixtures and articles specified in Section 2.1 of Annex I where necessary in the interests of defence. The act was published on 3 November and enters into force on 23 November 2026. Manufacturers, importers and suppliers need to check the CLP basis separately; a REACH exemption should not be treated as sufficient evidence. The relevant national decision, covered products and remaining obligations concerning safety information and chemical risk management should be established.<\/p>\n<h3>The basis for defence exemptions for biocides changes<\/h3>\n<p>EU \/ Bulgaria \u00b7 biocides and treated articles \u00b7 adopted legislative amendment<\/p>\n<p>Article 3 of Regulation (EU) 2026\/2382 replaces the defence exemption provision in the Biocidal Products Regulation. The new wording allows Member States to exempt biocidal products, on their own or in treated articles, where necessary in the interests of defence. Publication was on 3 November and entry into force is on 23 November 2026. The change concerns suppliers of disinfectants, preservatives and other biocidal products for defence applications. It does not create automatic authorisation for every product with a military customer. Before changing market-access procedures, specifications or audit evidence, organisations should check for an applicable national exemption and its precise product scope.<\/p>\n<h3>US updates testing for automatic garage door operators<\/h3>\n<p>United States \u00b7 product safety and electromechanical systems \u00b7 final rule with a conditional effective date<\/p>\n<p>On 30 October, CPSC published a rule aligning mandatory requirements for automatic residential garage door operators with UL 325:2025. Changes include entrapment-protection testing using backup battery power, including at the lowest operating voltage, and clarifications to instructions. The announced effective date is 29 December 2026, unless significant adverse comments are received by 30 November. Manufacturers, exporters and laboratories serving the US market should review their testing programmes and documentation. The rule retains the existing certification and recordkeeping subparts; it does not introduce a separate new certification scheme.<\/p>\n<h2>Upcoming deadlines<\/h2>\n<h3>One month to comment on remote access in clinical laboratories<\/h3>\n<p>United States \u00b7 medical laboratories and digital results \u00b7 consultation \u00b7 T\u201330<\/p>\n<p>Comments on proposed CLIA amendments in CMS-3478-P close on 7 December 2026. This is a T\u201330 reminder concerning a document published on 8 October. The remote-access proposal would allow professionals to review digital laboratory data, results and images under the certificate of the main laboratory that generated them; cytology is excluded from this possibility. The proposal is not yet a final rule. Laboratories and suppliers serving US testing can assess access controls, responsibilities, review traceability and boundaries between work locations. The specific proposed conditions should be checked before planning changes to existing certification.<\/p>\n<h2>Strategic Watch<\/h2>\n<h3>EUCC gains guidance for applications using secure elements<\/h3>\n<p>EU \u00b7 cybersecurity and evaluation \u00b7 published technical guidance<\/p>\n<p>On 4 November, ENISA published EUCC guidance for evaluating applications using a Cryptographic Service Provider (CSP) in secure elements. The methodology considers how a harmonised interface and encapsulated security services can support application evaluation across different chip platforms. It specifies that CSP implementations must be certified at EAL4 augmented with AVA_VAN.5. This is technical guidance within the scheme and should be read together with the applicable evaluation rules. Developers, laboratories and certification bodies should check the scope of component certificates, composition assumptions and evidence of equivalent behaviour across platforms before choosing an evaluation approach.<\/p>\n<h3>Global ACI extends mutual recognition to ISCC CORSIA<\/h3>\n<p>International \u00b7 sustainable aviation fuels and certification \u00b7 adopted MRA scope decision<\/p>\n<p>Global ACI Resolution 2026-50 extends the multilateral recognition arrangement to ISCC CORSIA as a sub-scope of product certification under ISO\/IEC 17065:2012. The decision from the autumn meetings in Panama appears in the current resolutions register and EA\u2019s summary of 3 November. Its scope includes requirements for certification bodies and auditors, traceability, audit risk and life-cycle emissions. This changes the recognition infrastructure; it does not automatically extend every individual certificate or accreditation. Bodies and participants in sustainable aviation fuel supply chains should check the specific accreditation scope, recognition status and applicable versions of scheme documents.<\/p>\n<h3>BDS consults on national concrete conformity rules<\/h3>\n<p>Bulgaria \u00b7 construction materials and certification \u00b7 consultation on draft standards<\/p>\n<p>On 3 November, the Bulgarian Institute for Standardization (BDS) opened a public consultation on national annexes prBDS EN 206-1:2026\/NA and prBDS EN 206-2:2026\/NA. They cover national requirements for concrete performance, production control, conformity assessment and certification, reflecting local conditions and construction experience. Comments are accepted until 18 December 2026. The documents are drafts and do not yet replace applicable rules. Concrete producers, laboratories, designers and certification bodies should compare the proposed national provisions with current specifications, control plans and test evidence. This is an opportunity to raise practical difficulties or unclear criteria before final adoption.<\/p>\n<h3>National annexes to EN 1990 are open for comment<\/h3>\n<p>Bulgaria \u00b7 structural design and assessment \u00b7 consultation on draft standards<\/p>\n<p>The consultation announced by BDS\/TC 56 on 3 November includes national annexes to EN 1990-1 for new structures and EN 1990-2 for assessment of existing structures. They form part of the national framework being prepared for the revised Eurocodes. Comments close on 3 December 2026. Their status remains draft national annexes; opening the consultation does not immediately change applicable design requirements. Design and consulting organisations, construction supervision bodies and clients should review the national parameters and their connection with methods used to demonstrate reliability. Comments may identify inconsistencies between design assumptions, assessments of existing buildings and the evidence required.<\/p>\n<h3>Get It Fair ESG assurance enters the MRA scope<\/h3>\n<p>International \u00b7 ESG, verification and validation \u00b7 adopted MRA scope decision<\/p>\n<p>In Resolution 2026-51, Global ACI approves inclusion of the Get It Fair scheme for ESG assessment and reporting assurance as a sub-scope of validation and verification under ISO\/IEC 17029:2019. The decision from the Panama meetings is confirmed in Global ACI\u2019s register and EA\u2019s summary of 3 November. It specifies particular versions of scheme documents GIF DOC 100 and GIF DOC 121. Verification bodies and organisations commissioning ESG assessments should distinguish this scheme recognition from their own authorised accreditation scope. Competence, scope and assurance issuance rules need to be checked, without assuming automatic equivalence with every other sustainability regime.<\/p>\n<h3>BDS invites comments on ground property characterisation<\/h3>\n<p>Bulgaria \u00b7 geotechnics and testing evidence \u00b7 consultation on a draft standard<\/p>\n<p>The BDS consultation of 3 November includes the draft national annex to EN 1997-2:2024 on ground properties. Comments close on 3 December 2026. The document remains a draft, and opening the consultation does not replace existing requirements. The subject directly connects geotechnical investigations, laboratory and field results, and their use as design evidence. Investigation organisations, laboratories, designers and construction supervisors should review the proposed national parameters and their connection with the methods used. Specific inconsistencies between investigation results, the selection of properties and design documentation can be raised before final adoption.<\/p>\n<h3>National parameters for seismic action are under consultation<\/h3>\n<p>Bulgaria \u00b7 seismic safety and design \u00b7 consultation on a draft standard<\/p>\n<p>The BDS consultation announced on 3 November includes the national annex to EN 1998-1-1:2024 on general rules and seismic action. Comments close on 3 December 2026. This is a draft associated with Eurocode 8, rather than an announcement of an immediately applicable new mandatory design regime. Design organisations, clients, technical control bodies and safety experts should compare the proposed national parameters with their design basis and documentation of seismic assumptions. Its importance lies in early identification of inconsistencies that could later affect safety assessments and design checks. Comments should identify the specific technical provisions requiring clarification.<\/p>\n<h3>EU recommends clauses for security and switching cloud providers<\/h3>\n<p>EU \/ Bulgaria \u00b7 cloud services and supplier management \u00b7 non-binding recommendation<\/p>\n<p>Commission Recommendation (EU) 2026\/2394, published on 6 November, provides non-binding standard contractual clauses for cloud services. This part of the document supports implementation of the Data Act when switching providers, using services in parallel, and addressing security and continuity during transition. The templates may be adapted; their use alone does not demonstrate compliance with all applicable requirements. Cloud customers and providers should compare their contracts, exit plans and portability evidence with the proposed clauses. This offers a practical reference for supplier management and continuity audits, while the mandatory rules remain those in applicable legislation.<\/p>\n<h3>FDA revises draft guidance on drug delivery performance evidence<\/h3>\n<p>United States \u00b7 medical devices and combination products \u00b7 consultation on revised draft guidance<\/p>\n<p>On 30 October, FDA announced revised draft guidance, Essential Drug Delivery Performance Characteristics for Devices Intended to Deliver Drugs and Biological Products. It replaces the July 2024 draft and clarifies testing and control of device characteristics for drug delivery, including alignment with QMSR. Recommendations cover development data, market-access submissions and post-market changes. Comments for consideration before a final version is prepared are accepted until 28 January 2027. Manufacturers of devices and combination products for the US should compare their testing evidence and change management with the draft. The guidance remains a non-binding draft.<\/p>\n<h3>Persistent pollutant risk assessment will consider defence supply chains<\/h3>\n<p>EU \/ Bulgaria \u00b7 chemicals and persistent organic pollutants \u00b7 adopted amendment with future application<\/p>\n<p>Regulation (EU) 2026\/2382 also amends the persistent organic pollutants regime. When collecting, assessing and submitting socio-economic information for risk management evaluation, the Commission and Member States must consider defence readiness and the specific features of defence supply chains. The act was published on 3 November and enters into force on 23 November 2026. This is a strategic signal concerning the future evidence base for decisions under the Stockholm Convention, rather than a general exemption from substance restrictions. Manufacturers and suppliers should prepare traceable data on uses, available alternatives and supply-chain dependencies when participating in the relevant evaluations or consultations.<\/p>\n<h3>New contract templates for access to connected-product data<\/h3>\n<p>EU \/ Bulgaria \u00b7 industrial data and connected products \u00b7 non-binding recommendation<\/p>\n<p>Recommendation (EU) 2026\/2394, published on 6 November, offers separate non-binding contract templates for data access and use under the Data Act. They cover relationships between data holders, users of connected products and data recipients, including provision of data to a third party at a user\u2019s request. The aim is fair contractual terms, reasonable compensation and protection of trade secrets. For equipment manufacturers, operators and digital service providers, this is a reference when arranging access to operational and diagnostic data. Roles, permitted uses, protective measures and the compatibility of contractual changes with mandatory rules should be checked.<\/p>\n<h3>National rules for steel buildings enter consultation<\/h3>\n<p>Bulgaria \u00b7 steel structures and technical control \u00b7 consultation on a draft standard<\/p>\n<p>BDS is consulting on the national annex to EN 1993-1-1:2022, covering general rules and rules for buildings in the design of steel structures. The announcement dates from 3 November, and comments are accepted until 3 December 2026. The draft forms part of national preparation for Eurocode 3 and is not yet a final annex. Designers, steel structure manufacturers, clients and technical control bodies should check the proposed national parameters against their calculation assumptions and specifications. The practical task is to establish whether design documentation, material requirements and execution evidence remain consistent. Objections should refer to specific clauses and technical examples.<\/p>\n<p>Published by MG Global in partnership with ERPI.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u0420\u0435\u0433\u0443\u043b\u0430\u0442\u043e\u0440\u0435\u043d \u043e\u0431\u0437\u043e\u0440 \u043d\u0430 MG Global \u0432 \u043f\u0430\u0440\u0442\u043d\u044c\u043e\u0440\u0441\u0442\u0432\u043e \u0441 ERPI \u2014 7 \u043d\u043e\u0435\u043c\u0432\u0440\u0438 2026 \u0433.<\/p>","protected":false},"author":7,"featured_media":46333,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[42],"class_list":["post-46509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-moody-news-daily"],"_links":{"self":[{"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/posts\/46509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/comments?post=46509"}],"version-history":[{"count":1,"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/posts\/46509\/revisions"}],"predecessor-version":[{"id":46510,"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/posts\/46509\/revisions\/46510"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/media\/46333"}],"wp:attachment":[{"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/media?parent=46509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/categories?post=46509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mgglobal.eu\/en\/wp-json\/wp\/v2\/tags?post=46509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}